More than 100.000
meters performed of horizontal drifts in
coal, advanced by continuos miners.
More than 20.000 meters advanced of
drifts and tunnels in rock, with
continuos miners, jumbos and/or
traditional method.
More than 3000 meters advanced of
inclined shafts in coal, up to 16º (upwards
and downwards), with continuos miners.
More than 2.500 meters advanced of
inclined shafts in rock, up to 30º, with
continuos miners and traditional method.
|